NEWS

Full Operational of Connection Bridge EJIP - MM2100

Full Operational of Connection Bridge EJIP - MM2100 10 October 2017

Connection Road EJIP/Lippo to MM2100 will start 24 hours operation on October 2017. The road applicable for small Vehicle (max.height 2,10 m) and motorcycle.


Some traffic engineering (change of traffic flows) for smooth traffic will be inform later.

Other News

02 July 2018
Acreditation EJIP E-Lab

KAN issued ISO17025

01 June 2018
New Traffic Arrangement

Traffic Engineering at Jl. MH.Thamrin

26 February 2018
Traffic Measures at Cikampek Toll Road from Mar. 12, 2018

Traffic Congestion Ease Measures at Cikampek Toll Road from Mar. 12, 2018

19 February 2018
New Traffic Arrangement at The Intersection of EJIP Main Gate

New traffic arrangement at the intersection of EJIP Main Gate (EJIP/Delta Silicon) to reduce the traffic congestion and potential risk for traffic accident