NEWS

Full Operational of Connection Bridge EJIP - MM2100

Full Operational of Connection Bridge EJIP - MM2100 10 October 2017

Connection Road EJIP/Lippo to MM2100 will start 24 hours operation on October 2017. The road applicable for small Vehicle (max.height 2,10 m) and motorcycle.


Some traffic engineering (change of traffic flows) for smooth traffic will be inform later.

Other News

26 February 2018
Traffic Measures at Cikampek Toll Road from Mar. 12, 2018

Traffic Congestion Ease Measures at Cikampek Toll Road from Mar. 12, 2018

19 February 2018
New Traffic Arrangement at The Intersection of EJIP Main Gate

New traffic arrangement at the intersection of EJIP Main Gate (EJIP/Delta Silicon) to reduce the traffic congestion and potential risk for traffic accident

10 August 2017
Bridge of Industrial Area MM2100 - EJIP

Bridge between regions connecting MM2100 Industrial Estate - EJIP across Kali Cikarang, has been opened.

27 April 2016
Grant 12 patrol motorcycle from EJIP and Epson

EJIP with Epson gave grants 12 motorcycles patrol to Bekasi Police (EJIP grants 10 motors and Epson grants 2 motors)